Hmm
The software works, is the thing. The synchronization process works without issue. Odd.
Edit: Googling led to a MSDN dev post that indicated -
"Error 2762 occurs when a deferred style custom action (deferred, rollback, or commit) is sequenced before InstallInitialize or after InstallFinalize in the execute sequence, or if it is sequenced in the install UI sequence. Deferred type custom actions need to be sequenced in the execute sequence between InstallInitialize and InstallFinalize."
Last edited by Ifthir; 11-23-2008 at 05:55 PM..
|